HomeSolutionsAboutDocumentation

Create and edit a purchase order

Create a purchase order (PO) for what you plan to buy, from whom, at what price and where it should arrive. Save it as a draft, check it, then send it.

If you are combining demand across products or ordering in packs, start with an Order plan. Applying a reviewed plan creates draft POs for you.

Before you start

  • An active supplier with linked products. Check each product's supplier SKU, unit and price in supplier products.
  • A receiving location with a complete shipping address. You can save a draft without one, but you can't send the order until the address is complete. See locations and stock pools.

Create the draft

  1. Open Purchase orders and select Create purchase order.
  2. Check PO number. It starts with a date-based number; replace it if you use your own numbering.
  3. Select the Supplier and the Ship to (stock pool) where the goods will arrive.
  4. Check Payment terms, Currency and Requested delivery. If the supplier's currency is preselected, select its confirm button, such as Confirm USD.
  5. Under Add products, search by product name, SKU or supplier SKU, and select each product you want.
  6. On each line, check Qty, UoM and Unit cost together. Remove lines you don't want. Use Sort (by SKU or Name) or the move buttons to put lines in the order your supplier expects.
  7. Fill in Additional details and check the Cost summary.
  8. Select Save as draft.

Check the result: the saved PO shows status Draft with your supplier, destination, currency, lines and total.

Saving a draft does not contact the supplier or change stock. When the draft is ready, send it.

Quantities and prices use the line's unit

The UoM on a line applies to both the quantity and the unit cost.

Example: Northwind Packaging sells Kraft mailers (MAILER-KR6) in cases of 24. You hold them in each, at USD 1 each. To order three cases, enter 72 on the EA line at 1.00. The line total is USD 72. Don't enter 3 on an EA line to mean three cases, or a case price on a per-each line.

Changing a unit label does not convert the quantity or price. When a supplier sells in cases and you stock in each, use the Order plan, which converts for you. See units, packs and barcodes.

Notes, charges and currency

  • Note to supplier is shared with the supplier. Use it for delivery instructions or a reference.
  • Internal notes stay with your team.
  • The Cost summary takes shipping, tax and adjustments. An adjustment can add or deduct a value or a percentage. Give each one a clear description.
  • Every line price must be in the PO currency. Picking another currency does not convert prices.

Edit a draft or sent order

Open the PO and select Edit. Edit is available while the order is Draft or Submitted.

  • PO number can change until the order is sent. After that it shows Fixed once the order is sent.
  • The supplier and the destination are fixed once the PO is created. To change either, create a new draft.
  • Currency locks once the order has lines, a total or adjustments.
  • You can add products only to a draft. For a sent order, put extra products on a new PO.

Select Save when you're done. To respond to supplier changes, use Review supplier changes instead of Edit.

Download a copy

Use More actions → Download PDF, Export as Excel (.xlsx) or Export as CSV. A download is a snapshot; it does not update when the PO changes.

If something goes wrong

What you see What to do
Destination address required before sending Complete the location's shipping address, then send. You can still save the draft.
Another purchase order already uses this number. Enter a different PO number.
Suppliers, destinations or products could not be loaded Select Check again. An empty list here does not mean your records were deleted.
Saving timed out Look for the PO number in Purchase orders before creating it again. See troubleshooting.