HomeSolutionsAboutDocumentation

Create and maintain bills of materials

A bill of materials (BOM) lists the components used to make a material, and how much output they make. Production orders use a material's active Manufacturing BOM.

Before you start

  • Create the output material and each component as materials, with the right units. For example, a kraft box in each, tissue in sheets and ribbon in metres.
  • Decide the BOM's Usage type:
Usage type Use it for
Manufacturing The recipe production orders use.
Engineering A design recipe. You can promote it to a Manufacturing draft later.
Costing Comparing costs and sourcing choices. Production orders don't use it.

Create a BOM

  1. Open the output material in Materials and select the BOM tab.
  2. Select Create BOM.
  3. In Create Bill of Materials, choose the Usage type and enter Base quantity and Base UoM. The base quantity is how much output the whole recipe makes, not a supplier's case size.
  4. Add Notes if useful, then select Save. The BOM starts as a draft.
  5. Select Add component. In Component material, type at least two characters of the name or SKU and choose the material.
  6. Enter Quantity (for the whole base quantity), UoM and Scrap %, then select Add.
  7. Repeat for each component.

Check the result: each component is listed with its quantity and unit. Select a row to open Component Detail, where you can Save changes or Remove it.

If a component doesn't exist yet, the search offers + Create with its name. Check the details, then select Create & Add to BOM.

How quantities are calculated

For each component, a production order needs:

Quantity × (1 + Scrap % ÷ 100) × planned output ÷ Base quantity

For example, a Gift box recipe with a Base quantity of 1 uses 1 kraft box, 2 tissue sheets and 1 metre of ribbon. A run of 10 Gift boxes needs 10 kraft boxes, 20 tissue sheets and 10 metres of ribbon. With a 5% scrap allowance on ribbon, its Effective qty is 1.05 metres, so 10 boxes plan 10.5 metres. The other production guides use this example.

Activate a version

  1. Review every component, unit and quantity.
  2. Select Activate.

Check the result: the version tab shows it as active. Active versions can't be edited directly.

To change an active recipe, select New Version. This copies it to a new draft. Edit and activate the new version. Activating doesn't deactivate the old one, so select Deactivate on any version you no longer want used. An inactive version offers Reactivate, and an unwanted draft offers Delete draft.

Version tabs are grouped by usage type when you have more than one.

Promote an Engineering BOM

On an Engineering BOM, select Promote to Manufacturing. It creates a new Manufacturing draft with the same recipe and keeps the Engineering BOM. Read any warnings about components or locations, review the draft and activate it.

Compare sourcing options

Component rows show BUY, MAKE or UNRESOLVED. Where alternatives exist, select one marked click to swap to try another supplier or BOM. Unsaved choices show Scenario. Select Save on a draft, or Save as new version on an active BOM. If that combination already exists, you can open that version instead.

Expand a row to see its Sub-Components. A production order uses only the direct components; a semi-finished component needs its own build and stock.

To replace a component in an active recipe, create a New Version, remove the old component and add the new one.

If something goes wrong

What you see What to do
A production order's selected BOM became inactive Follow Review on the order and choose the right version.
Promote to Manufacturing is refused Check the component statuses it names.
A rounding or calculation error on save Fix the recipe quantities. Don't round them just to pass the check.