Configure trade details and estimate landed cost

Set up a supplier item's origin, customs classification, purchasing terms and duty rules, then see an estimated landed cost for a receiving location. Order plan uses the same inputs to rank suppliers.

The estimate is a preview. It doesn't create a purchase order, receive stock or record a cost.

Before you start

  • The supplier item must be linked to the material, with its units and price. See Link products and configure supplier prices.
  • Know the goods' country of origin, their commodity code, the purchasing terms you agreed, and the duty and tax rules for the route.

Check readiness from a supplier or material

  1. Open the supplier or the material and select Landed-cost readiness.
  2. In Check landed-cost readiness, choose the Supplier item and Receiving stock pool, and enter an Estimate quantity in the material's base unit.
  3. Read the badge and the amounts.
  4. Select Open full workbench to fix anything missing.

If the material has more than one supplier, the drawer asks you to open the full workbench and choose one there.

The receiving stock pool matters: a different destination can change the customs territory, freight and duty rules.

Configure the trade lane

In the Landed cost workbench, work through the numbered sections. Start by checking 1. Choose the costing context: the supplier, Supplier item / material, Receiving stock pool and quantity.

  1. 2. Product and trade lane: set the Country of origin for this supplier item, and the Destination customs territory for the receiving stock pool. Origin belongs to the goods, not the supplier's address. The territory applies to every item received into that pool.
  2. 3. Customs classification: select Add classification (or Replace classification). Enter the classification system, commodity code, destination scope and effective dates, then select Create (or Create & supersede).
  3. 4. Procurement terms and responsibility: select Add terms (or Replace terms). Set delivery terms and who pays duties and taxes, then select Create and activate terms (or Replace active terms).
  4. 5. Taxes, duties, and tariffs: select Add charge. Enter the destination, commodity-code prefix, charge type, calculation method, rate, origin scope and effective dates, then select Create.

Tips for charge rules:

  • For a percentage, enter 25 for 25%. A per-unit rate is a money amount.
  • Enter commodity-code prefixes as digits, without *.
  • An end date is not included in the rule's validity.
  • Rules are shared. A rule applies to every material whose code and origin fall in its scope.
  • Exclusive is not a priority. Two conflicting rules in the same stacking group leave the estimate unresolved.

For organization-wide lists, legal entities, registrations and pool territories, open Settings › Trade & costing.

Configure freight

  1. Open the supplier and find Sourcing by location.
  2. On the receiving location's row, set Estimated freight. For a per-unit rate, enter Estimated rate and Currency.
  3. Select Save sourcing on that row.

No freight means freight is zero. If freight is not set, it is unknown, and the estimate says so. Per shipment freight is saved but not yet used to rank suppliers. See Configure suppliers by receiving location.

Read the result

Badge Meaning
Ready The customs estimate is calculated from the current classification, terms and charge rules.
Needs inputs Customs is unknown. What is missing lists what to add.
Domestic lane Origin and destination are in the same customs territory, so no border charges apply.
Not configured No customs setup yet for this lane. Charges are unknown, not zero.

The amounts are shown separately: Estimated merchandise (customs basis), Sourcing freight, Buyer-borne customs and, when available, recoverable import tax. Estimated landed total and Landed per unit appear only when every part is known and in one currency.

If the supplier's order multiple or pack size rounds your quantity up, the result says which quantity it used.

For charges in another currency, open Advanced and set the Costing basis date, the date exchange rates are taken from.

If something goes wrong

What you see What to do
The estimate could not be calculated Try again. If it keeps happening, contact support with the supplier item and receiving pool.
No active charge rule matches this territory, commodity code and origin. Add a charge rule, or check the rule's dates and scope.
Procurement terms do not say who bears duties and taxes. Edit the terms in section 4.
Set the destination customs territory on the stock pool. Set it in section 2.
No currency basis date was supplied, so cross-currency charges cannot be converted. Set Advanced › Costing basis date.