InicioSolucionesAcerca deDocumentación

Configure suppliers by receiving location

Tell Zapstra which of your locations each supplier can deliver to, how long it takes, and what freight to expect. Order plans use this to pick a supplier and date for each destination.

Before you start

  • The supplier exists and its products are linked.
  • Your locations and stock pools are set up. Several stores can share one stock pool; configure the pool once, not once per store.
  • Only locations Managed in Zapstra are planned. Locations marked Not managed are left out of order plans and replenishment.

Set a supplier's delivery locations

  1. Open the supplier and stay on Overview.
  2. Find Sourcing by location and the row for a destination.
  3. Tick Eligible if the supplier can deliver there. Clear it to exclude the supplier at that location.
  4. Choose Estimated freight (see the table below). For a rate, enter Estimated rate and choose the Currency.
  5. Enter Lead time (days) as a whole number, or leave it blank if you don't know it. Zero means same-day.
  6. Select Save sourcing for that row.
  7. Repeat for each destination. Each row saves on its own.
Estimated freight Use when You enter
No freight You expect no freight charge Nothing else
Per base unit Freight scales with quantity Rate and currency per base unit
Per shipment You have a flat charge per shipment Rate and currency per shipment

Check the result: reload the page and confirm each row. A row you never saved may show No freight; that isn't a saved choice. Save the right option.

A per-base-unit rate multiplies the quantity in base units, not supplier packs. Per-shipment freight is added to the purchase order estimate but isn't used to rank suppliers, so compare group totals in the proposal. Freight estimates don't post invoices or change inventory cost.

Override one product at one location

Use this when one product differs from the supplier's usual arrangement, such as a longer lead time.

  1. Open the material and select Suppliers.
  2. On the supplier's card, select Sourcing overrides.
  3. Choose the Stock location and read Inherited supplier baseline.
  4. Set Eligibility override to Inherit supplier baseline, Eligible or Ineligible.
  5. Enter Lead time override (days) if needed. Leave it blank to inherit.
  6. Select Save override.

Check the result: reopen the same supplier and location and confirm the values. The override applies only to that product, supplier and location. Freight always comes from the supplier's location row.

Reset to inherited removes both overrides and saves at once.

Which lead time wins

From most to least specific:

  1. A product's lead time override at a location
  2. The supplier's lead time for that location
  3. The lead time on the product link

The material's Maximum supplier lead time (days) is a limit, not a delivery estimate. Suppliers with a longer or unknown lead time are left out under that limit. Eligible doesn't make an inactive supplier or link usable.

If something goes wrong

What you see What to do
Sourcing settings unavailable Refresh. Editing is paused until saved settings load.
No active stock locations. Set up or reactivate a location in locations and stock pools.
A location is missing from the table Check that it's active in locations and stock pools.
The proposal shows no date or freight Add the lead time or freight on the location row. Missing values stay visible as missing.